To the central content area

Operation, maintenance and analysis plan of information display system for Tainan air quality monitoring station in 105

Absrtact
This project covered the operation and maintenance works of Air Quality Monitoring Station (AQMS) in Tainan City in which assuring the normal conditions of facilities of AQMS and quality of sampling data, reporting the comprehensive maintenance records, summarizing the improvement measures as well as reporting latest conditions to Environmental Bureau. Taken into account assuring of maintenance work in compliance with standard of quality and assurance of AQMS, this project included the formulation a set of standard operation procedures and maintenance form. The major achievements of project, started from 12 August 2016 to 8 May 2017, were summarized as followings: 1. Air Quality Monitoring Station Sampling Analysis a) Dust Measurement Dust collection and analysis was scheduled to be completed 108 times throughout the contract term. As the water-proof construction work on the rooftop of Minde Junior High School station, the dust measurement was suspended during the anticipated construction period from 1 April 2017 to 31 May 2017. As of the end of this project, it completed 107 times of dust collection and analysis and achieved 99% data capture rate. b) Total Suspended Particulates (TSP) Sampling Analysis Total suspended particulates (TSP) sampling analysis was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% data capture rate. 2. Air Quality Monitoring Station maintenance and Calibration Works a) Maintenance Works of Analyzers and Samplers Maintenance of Analyzers and Samplers was scheduled to be completed 216 times throughout the contract term. As of the end of project term, it completed 214 times of analysis and achieved 99% completion rate. b) Calibration Works of Analyzers and Samplers One-point Flow Calibration was scheduled to be completed 108 times throughout the contract term. As of the end of project term, it completed 107 times of analysis and achieved 99% capture rate. Multi-point Flow Calibration, Timer Verification and Level-one Flow Calibration were completed 36, 24 and 2 times respectively and achieved 100% completion rate throughout the project term. c) Precision Check Precision check was completed 9 times throughout the contract term and achieved 100% completion rate. 3. Operation, Maintenance and Calibration Works of Air Quality Monitoring Station Monthly maintenance work, quarterly maintenance work and bi-yearly maintenance work were completed 18, 6 and 4 times respectively and achieved 100% completion rate. 4. Total Suspended Particulate Continuous Monitoring Work Monthly total suspended particulate continuous sampling work was scheduled to be completed 6 times throughout the project term. As of the end of term, it recorded 11 times of monthly sampling and analysis works and reached 183% completion rate. 5. Fine Suspended Particulate Sampling Work Fine suspended particulate sampling work was completed 24 times throughout the project term and reached 100% completion rate. Composition analysis of collected fine suspended particulate was scheduled to be completed 7 times throughout the project term. As of the end of term, composition analysis was recorded 9 times and reached 129% completion rate. 6. Routine maintenance of LED electronic display broad Routine maintenance of LED electronic display broad was scheduled to be completed 9 times throughout the project term. As of the end of term, it recorded 10 times of work and reached 111% completion rate. In year 2016, the collaboration in preparation of broadcasting materials was in total (63 item 277 quantity) 7. Smart City Air Quality Monitoring Network Service
Keyword
Analysis
Open
top